Project Description

Project Overview

The various flat roof areas of this large Midlands school and sixth form college, comprising of stone chippings on an old bitumen felt roof covering had reached the end of their natural life.

Consultants E3 Cube investigated and specified a replacement roof covering utilising a Langley Waterproofing system.

Having decided that the existing waterproofing, although old, had not been compromised, a specification involving the removal of the chippings followed by a power washing was produced.

An overlay system using self-adhesive vapour control layer, PU adhesive bonded insulation boards – cut-to-falls to provide satisfactory roof drainage – self-adhesive underlay and a torch-applied cap sheet was specified and installed by our skilled operatives, all in accordance with our ‘Safe-to-torch’ policy.

This project was carried out entirely during the 2020/21 Covid19 pandemic, with all health & safety protocols strictly adhered to.

Project Details

CLIENT

Alderbrook School

CONSULTANT

E3 Cube

ROOFING SYSTEM

Langley Waterproofing Overlay System

Self-Adhesive Vapour Control Layer, Self-Adhesive Underlay and Torch-on Cap Sheet

PU Adhesive

Cut-to-Falls Thermal Insulation

Download PDF

BBR Case Study Alderbrook School

Can We Help You With Your Next Roofing Project?

Call us on 0151 993 9900

Get in Touch with our Experts

Send us a message and see how BBR Roofing can help make your next project a success

FIRST NAME *
LAST NAME *
EMAIL ADDRESS *
PHONE NUMBER

SUBJECT

HOW CAN WE HELP?